menumore_vert

Report 20140901A

Date

September 01, 2014

Administration

Barack Obama (Second Term)

Location

Iraq

Was 4(a)(1) Triggered? (Hostilities/Imminent Hostilities)

Yes, described in/inferred from report

Was 4(a)(2) Triggered? (Combat- Equipped Introduction)

No, as described in/inferred from report

Was 4(a)(3) Triggered? (Substantial Enlargement)

No, as described in/inferred from report

Joint/Coalition Mission

Yes

Details: “These actions are being undertaken in coordination with and at the request of the Iraqi government.”

Article 51 Report to UN

Not applicable because no self-defense claim

Constitutional Caveat

No

Classified Annex Reported

No

Purpose/Mission

Humanitarian

Details: “support of an operation to deliver humanitarian assistance to civilians in the town of Amirli, Iraq, which is surrounded and besieged by ISIL”; “to address this emerging humanitarian crisis and protect the civilians trapped in Amirli”

Domestic Legal Authority

Constitution (Art. II)

Details: “I have directed these actions, which are in the national security and foreign policy interests of the United States, pursuant to my constitutional authority to conduct U.S. foreign relations and as Commander in Chief and Chief Executive.”

Claimed International Legal Basis

Consent of territorial state

Details: “These actions are being undertaken in coordination with and at the request of the Iraqi government”

Estimated Scope/Duration

Mission-bound but indeterminate

Details: “limited in their scope and duration as necessary to address this emerging humanitarian crisis and protect the civilians trapped in Amirli”

Type of Enemy or Mission

Non-state actor

Details: Islamic State of Iraq and the Levant (ISIL)

Military Activity

Air operations

Details: “targeted airstrike operations in the vicinity of Amirli, Iraq”

US Casualties Reported

Unknown

Non-US Casualties Reported

Unknown

Reporting as it Relates to Termination Clock

More than 60 days sustained activity

Related Periodic Reports

P20141211

12/11/2014

P20150611

06/11/2015

P20151211

12/11/2015

P20160613

06/13/2016

P20161205

12/05/2016

P20170606

06/06/2017

P20171211

12/11/2017

P20180608

06/08/2018

P20181207

12/07/2018

P20190611

06/11/2019

P20191211

12/11/2019

P20200609

06/09/2020

P20210608

06/08/2021

P20211207

12/07/2021

P20220608

12/07/2021

P20221208

12/08/2022

P20230608

06/08/2023

P20231207

12/07/2023

P20240607

06/07/2024