menumore_vert

Report 20140923A

Date

September 23, 2014

Administration

Barack Obama (Second Term)

Location

Syria

Was 4(a)(1) Triggered? (Hostilities/Imminent Hostilities)

Yes, described in/inferred from report

Was 4(a)(2) Triggered? (Combat- Equipped Introduction)

No, as described in/inferred from report

Was 4(a)(3) Triggered? (Substantial Enlargement)

No, as described in/inferred from report

Joint/Coalition Mission

No

Article 51 Report to UN

Yes

Details: S/2014/695

Constitutional Caveat

No

Classified Annex Reported

No

Purpose/Mission

Respond to threat

Details: “These strikes are necessary to defend the United States and our partners and allies against the threat posed by these elements [of al-Qa’ida known as the Khorasan Group].”

Domestic Legal Authority

Const. (Art. II) and Statute

Details: “I have directed these actions, which are in the national security and foreign policy interests of the United States, pursuant to my constitutional and statutory authority as Commander in Chief (including the authority to carry out Public Law 107-40) and as Chief Executive, as well as my constitutional and statutory authority to conduct the foreign relations of the United States.”

Claimed International Legal Basis

Self-Defense

Details: “These strikes are necessary to defend the United States and our partners and allies against the threat posed by these elements.”

Estimated Scope/Duration

None provided

Type of Enemy or Mission

Non-state actor

Details: “Elements of al-Qa’ida known as the Khorasan Group”

Military Activity

Air operations

Details: “a series of strikes in Syria”

US Casualties Reported

Unknown

Non-US Casualties Reported

Unknown

Reporting as it Relates to Termination Clock

More than 60 days sustained activity

Related Periodic Reports

P20141211

12/11/2014

P20150611

06/11/2015

P20151211

12/11/2015

P20160613

06/13/2016

P20161205

12/05/2016

P20170606

06/06/2017

P20171211

12/11/2017

P20180608

06/08/2018

P20181207

12/07/2018

P20190611

06/11/2019

P20191211

12/11/2019

P20200609

06/09/2020

P20210608

06/08/2021

P20211207

12/07/2021

P20220608

12/07/2021

P20221208

12/08/2022

P20230608

06/08/2023

P20231207

12/07/2023

P20240607

06/07/2024